EV Ready Plans

Outline steps to equip a building with the electrical infrastructure required to provide EV charging for residents.

Electrical Planning Reports

Evaluate the current electrical capacity of buildings to determine if they will meet future requirements

EV Charging

Installation of EV charging stations (Level 1, Level 2, Level 3, Tesla Mobile Connectors & Wall Chargers)

Institutional

Work with General Contractors or Institutional Projects Departments to renovate, maintain, upgrade and repair within specs and guidelines with emphasis on safety, proper protocol and staying within the specified timelines.

Commercial Tenant Improvements

Electrical demolition, replacement, upgrade of electrical and data systems.